Steps

1. Complete removal of the existing roof system including shingles, tile, asphalt sealants, boots, vents, and fasteners.
2. Rotted Decking Replacement
Remove and replace any and all rotted roof sheathing throughout entire roof area.
3. Rotted Trusses and Supports
Mature leaks may have caused truss, sub-fascia and/or structural support damage. Such damage can not be verified at this time and may result in additional work to ensure a sound structural base.
4. Deck Fastening
Refasten entire roof deck using nails to “code plus” strength. **Note: This step may qualify for insurance reductions**
5. Underlayment
Install new modified peal and stick secondary water barrier underlayment to the entire roof surface.
6. Flat Roof Tie-In & Dead Valley
Install new modified rubber flat roof membrane at flat roof tie-in, fastened and masticsized, where applicable
7. Valley Metal
Install new valley metal down all valley areas, nailed and sealed. LB Solutions uses a closed valley installation for maximum protection.
8. Existing Skylights
Install new VELUX impact and energy star approved skylight over existing openings, where applicable.
9. Boots
Install new lead boots over plumbing stacks, fastened and masticsized, where applicable.
10. Vents
Install new vents over kitchen, dryer, and bathroom exhaust openings, fastened and sealed, where applicable.
11. Drip Edge
Install new pre-painted drip edge flashings around the entire perimeter of roof, fastened and masticsized.
12. Valley Metal
Install new valley metal down all valley areas, nailed and sealed. LB Solutions uses a closed valley installation for maximum protection.
13. Painting Boots & Vents
Paint all boots and vents to match shingle color where applicable.
14. Wind Resistant Starter Strip
Install special high wind resistant starter-strip shingles at perimeter of roof area, fastened and masticsized.
15. Shingle entire roof area using ultra high definition asphalt/fiberglass, fungus resistant shingles, nailed six (6) nails per shingle.
16. Hip & Ridge
Install special high wind resistant, seal-a-ridge cap shingles at all crown and hip areas
17. Attic Ventilation
Turtle vents, Power fans, Hip & Ridge vents, or Solar powered vents are installed to with your structure's air flow.
18. Clean Up
We will maintain a clean and organized work site during the process. Perform final clean-up including use of a magnet to remove all debris.including use of a magnet to remove all debris.
19. Final Inspection
Perform final checklist inspection to ensure quality install. Issue warranty from LB Solutions on work performed.
20. Warranty
Ten (10) year or extended warranties are available through the chosen vendor.